WELCOME TO MY
UH-13T
HOVERCRAFT SITE.
Home
Workshop
Hull
Live Cam
Thrust Duct
Lift Duct
Power House
Frame
Ribs
Controls
Cockpit
Engine Frames
Finished Photos
Enter your search terms
Submit search form
Frame Construction.
This is the starting of the frame assembly.
I have craft 1 and craft 2 started.
10-02-07
10-12-07
Installed the lift ducts and foamed them in place.
Looking at the bottom of the duct in place and
has been fiber glassed to the floor.
Bottom of the craft with the first coat of epoxy on it.
Along with the floor supports and landing feet.
BACK TO THEWEATHERCELL.COM
Inlive