WELCOME TO MY UH-13T HOVERCRAFT SITE.


   Home       Workshop       Hull       Live Cam       Thrust Duct        Lift Duct        Power House   


   Frame       Ribs        Controls       Cockpit        Engine Frames       Finished Photos   
Google


Frame Construction.


This is the starting of the frame assembly.





I have craft 1 and craft 2 started.


10-02-07










10-12-07



Installed the lift ducts and foamed them in place.





Looking at the bottom of the duct in place and
has been fiber glassed to the floor.



Bottom of the craft with the first coat of epoxy on it.
Along with the floor supports and landing feet.




BACK TO THEWEATHERCELL.COM

USA Weather Finder